Feforkampen (LA/OL-181) was again activated on June 6 in a really beautiful weather (although a bit windy). My two (impatient) “second operators” were together with me. Thus, the time available at the summit was limited (hi). The pole was fastened to the cairn, and my 20 meter longwire was put up as usual as an inverted L.
All QSOs were worked on 30 meter. After around 40 minutes 19 stations were worked, there were no more stations in the pile-up, and we have started the descension (since there were no rooms for any prolongation on SSB because I already had worked almost five times the required number of stations!).
Five DXCCs were worked: DL, G, HB9, LY, OK.
Ingen kommentarer:
Legg inn en kommentar